Holy Spirit Catholic Church Project
Tuscaloosa Alabama
2008
Before shipping the right and left sides were temporarily pieced together. |
||
The straight pieces can planed leaving virtually no hand stone cutting. |
||
Because this straight molding terminated in a "wash" it had to be had cut. |
||
Movie #1 | Movie #2 |